GENERAL INFO
Facts:
Value: £100,000 to date
2 phases
Manufacture lead in: 8 weeks
On-site: 1 week for first phase
Client Requirement:
Haribo, a German confectionary company required some of the partition systems at their offices in Castleford to be fire-rated because of dead-end corridors, but as they also had areas where fire-rating was not required, they wanted a solution that was cost effective, with different systems that looked similar
Project Team:
Client: Haribo
Architect: The Harris Partnership
Solution:
Feco system fecolux was the preferred option, the fecolux glazing allows for floor-to-ceiling E30 and EI30 glazing with narrow 30 mm frames.
Systems used in this case study